Start
996102e0
What should I do next?
Use this page when you know where the project is but not which GazeAudit page should come next. It is a navigation guide, not a scientific decision engine.
The shortest route is:
- Plan the research record before analysis choices become outcome-informed.
- Audit the canonical data and execute the declared alternatives.
- Interpret the complete evidence pattern before reducing it to manuscript prose.
- Revise after peer review without rewriting the submitted evidence layer.
- Handoff the final manuscript, response package, software identity, and archive as one reconstructable record.
Fast decision map
| Your current state | Build next | Start here | You are ready to leave the stage when… |
|---|---|---|---|
| The study is being designed or the analysis route is not yet declared | A governed project route | Audit planner and Project starter | source, endpoint, researcher-owned decisions, and intended method route are explicit |
| A canonical gaze table exists but the audit record is not complete | Structural QC + declared execution record | First real audit | the canonical mapping, QC record, valid branch denominator, execution status, and saved evidence are recoverable |
| The audit has run but the manuscript claim is not yet settled | Bounded interpretation | Interpret an audit result | completeness, endpoint identity, direction, magnitude, sensitivity, and unresolved uncertainty are separated |
| A reviewer has requested clarification or new work | A temporally separated revision record | Revision toolkit and Revision route map | every request is classified and linked to response, manuscript, evidence, and archive locations |
| The revision is complete and the manuscript is moving to resubmission/final record | Editor-facing and publication handoff | Resubmission readiness and Reproducible publication | reviewer items, version changes, evidence layers, software identity, and final claims reconcile |
Stage 1 — plan before analysis
Use this stage when
- the canonical source has not yet been bound to an analysis record;
- the endpoint is still being defined;
- several defensible preprocessing, measurement, QC, or analytical choices could vary;
- you need to decide which GazeAudit workflow families are relevant.
Build now
Preserve at least:
- source-data identity and expected schema;
- the scientific endpoint and unit of analysis;
- researcher-owned QC and exclusion decisions;
- plausible method families and alternative specifications;
- known uncertainty dimensions;
- software/version expectations.
Open next
- Audit planner — route declared study conditions to method families.
- Project starter — create the study/evidence directory structure.
- Researcher audit checklist — record decisions before, during, and after execution.
- Audit decision log template — preserve the reasoning in a copy-ready record.
Stage 2 — audit the canonical data
Use this stage when
- the input table is available;
- you need to map semantic columns explicitly;
- structural QC has not yet been preserved;
- a declared specification space needs to be executed;
- generated evidence is still scattered across notebooks or temporary files.
Build now
Your record should make it possible to recover:
- which canonical file was analysed;
- how participant, trial, timestamp, and gaze variables were mapped;
- which structural conditions were observed;
- which branches were valid before execution;
- which valid branches succeeded or failed;
- which outputs and fingerprints belong to the run.
Open next
- First real audit — the practical CSV → QC → specification → evidence route.
- Data onboarding — focus on structural mapping and preflight.
- Analysis-readiness governance — preview cohort consequences when readiness policy is part of the question.
- Audit output bundle — learn what each saved artifact establishes.
Stop condition
Do not move to interpretation because one preferred estimate exists. Move on when the declared valid denominator and execution status are recoverable, including valid failures.
Stage 3 — interpret before writing
Use this stage when
- analysis code has finished;
- a specification curve or sensitivity summary exists;
- coauthors are asking whether the result is “robust” or “fragile”;
- the Results section is about to be written.
Read the record in this order
- Execution completeness — how many valid branches were declared and how many succeeded?
- Endpoint identity — did every compared branch estimate the same scientific endpoint?
- Direction — does the sign change across valid successful branches?
- Magnitude — how much does the estimate move even when direction is stable?
- Sensitivity structure — which declared factors align descriptively with larger changes?
- Untested uncertainty — what important dimensions were not varied?
Open next
- Interpret an audit result
- Result-pattern reporting example
- Decision-to-report example
- Reporting robustness
- Manuscript readiness
Stage 4 — revise after peer review
Use this stage when
- reviewer comments have arrived;
- a clarification can be answered without rerunning analysis;
- the reviewer requests a new threshold, exclusion, sensitivity analysis, measurement assumption, or endpoint;
- a factual or analytical correction is required.
First classify the request
Use the Revision route map to distinguish:
documentation_clarification;correction;sensitivity_amendment;analytical_amendment;endpoint_amendment;measurement_amendment.
Then preserve the timing explicitly. A submitted 8 / 8 audit plus a reviewer-requested 4 / 4 amendment remains 8 / 8 submitted + 4 / 4 post-review. It does not become “12 pre-specified analyses.” If one of four valid post-review branches fails, the amendment is 3 successful / 4 valid, not 3 / 3.
Open next
- Peer-review revision checklist — the compact pre-change gate.
- Revision toolkit — the full revision workspace.
- Revision-round scenarios — compare common revision paths.
- Revision-package quickstart — create and validate structural provenance with the real CLI.
- Reviewer response letter — reconcile request, action, manuscript, and archive.
Stage 5 — resubmission and durable handoff
Use this stage when
- every reviewer item has an intended disposition;
- revised analyses and manuscript edits are complete;
- the team is preparing an editor-facing package;
- the publication-associated archive needs to be frozen.
Build now
Check that the final record connects:
- reviewer item → response category and action;
- response → submitted/post-review evidence layer;
- evidence → manuscript location;
- manuscript change → version-change manifest;
- generated outputs → exact software identity and provenance;
- final claim → editor-facing evidence map;
- unresolved limitation → final manuscript limitation text.
Open next
- Resubmission readiness
- Version-change manifest
- Submission-to-accepted-record example
- Publication/archive handoff example
- Reproducible publication workflow
Common branch points
“I only need to answer a reviewer clarification.”
Stay in the revision stage, classify it as documentation-only when appropriate, and preserve that no analytical rerun occurred. Do not manufacture an amendment denominator.
“A reviewer asks for a different endpoint.”
Create a separate endpoint record. Do not add the new endpoint to the denominator of the submitted endpoint merely because both appear in the same revised manuscript.
“A valid analysis branch fails technically.”
Keep the branch in the valid denominator, preserve the failure evidence, and report successful/valid counts separately. Do not shrink the denominator after observing execution.
“The manuscript is accepted. Is the science now validated?”
Editorial status and scientific validity are different layers. Archive the accepted record and its provenance without converting acceptance into a GazeAudit scientific label.
“My new study resembles one of the frozen case studies.”
Do not inherit the frozen outcome label. GazeBase incomplete, Korthals robust_negative, and Pedrotti/de Chambrier materially_fragile are protocol-bound records for those frozen cases.
A static route you can bookmark
This page is deliberately useful without JavaScript. The interactive homepage project-stage router is a faster entry point when scripting is available, while this guide keeps the same project-stage logic in a stable, searchable, linkable document.
For one continuous synthetic exercise across all five stages, continue to the project lifecycle walkthrough.
Scientific boundary
This route helps answer where to go next in the documentation. It does not answer whether a study design is valid, which threshold should be used, which participants should be excluded, whether a reviewer request is scientifically justified, whether an endpoint should change, or what substantive conclusion the study should reach.