
Declare an eyeprocess validation-evidence plan
Source:R/082-validation-evidence-programs-0-9.R
eyeprocess_validation_plan.RdCreates a deterministic validation plan. The plan describes software-validation scenarios and does not constitute evidence for the construct validity of any gaze, pupil, response-time, or psychometric measure.
Usage
eyeprocess_validation_plan(
families = c("recovery", "sbc", "stress", "reliability", "negative_control"),
sample_size = c(250L, 750L),
n_items = c(12L, 24L),
missing_rate = c(0, 0.15),
noise_level = c("reference", "elevated"),
specification = c("correct", "misspecified"),
replications = 20L,
seed = 20260811L,
label = "eyeprocess-0.9-m2"
)Arguments
- families
Validation-evidence families to include.
- sample_size
Validation sample size or vector of sample sizes.
- n_items
Number of items.
- missing_rate
Proportion of responses or observations set missing.
- noise_level
Declared simulation noise regime.
- specification
Whether the validation scenario is correctly specified or deliberately misspecified.
- replications
Number of simulation or validation replications.
- seed
Random-number seed for reproducible execution.
- label
Human-readable label.